IFS Applications Project Management
IFS Applications confirms 13 of the 22 project management capabilities we track, with a further 3 partially covered. Its deepest coverage is in Execution & Tracking; it is thinnest on Planning.
Project Management is a core strength for IFS Applications — a primary capability included in standard deployments. The product is best suited to asset-intensive industries needing erp, eam, and field service in one platform.
- 13of 22
- Capabilities confirmed
- 200
- Documented features
- Execution & Tracking
- Strongest area
- Planning
- Thinnest area
How IFS Applications scores against the 22 project management capabilities we track across every ERP in our catalogue.
- Execution & Tracking5 of 7
- Reporting & Billing4 of 8
- Planning4 of 7
“Not documented” means our research has not confirmed the capability either way — it is not a finding that IFS Applications lacks it. Coverage is scored against one shared capability list, so it is comparable between products.
The project management scope IFS Applications ships, grouped as the product itself organises it.
Complete Project Deliverables3
Covers marking a project's deliverables as complete and carrying the deliverables structure over to the equipment records it produced.
- Complete Project Deliverables StructureMarks the full structure of a project's deliverables as complete.
- Copy Deliverables Structure to EquipmentCopies a completed project deliverables structure onto the equipment record it created.
Will IFS Applications meet your complete project deliverables needs? Build your requirements and perform a full analysis.
Build my requirements →Contractor Order Execution4
Covers how external contractors view and accept work assignments, carry out the work, and report progress back into the system.
- Execute WorkLets a contractor carry out the work defined on an accepted assignment.
- Report WorkCaptures the work a contractor has completed against an assignment.
- View and Accept AssignmentLets a contractor view and accept a work assignment offered to them.
Will IFS Applications meet your contractor order execution needs? Build your requirements and perform a full analysis.
Build my requirements →Create Material Supply for Project Deliverables8
Covers generating and managing the material supply needed to fulfill project deliverables, including MRP calculations at both company and project level, supply requests for purchasing or manufacturing, and issuing material to the deliverable.
- Create Supply Request for Purchase Order PlanGenerates a supply request that feeds into a planned purchase order.
- Create Supply Request for Shop Order PlanGenerates a supply request that feeds into a planned shop order.
- Issue to Project DeliverablesIssues material from inventory directly to a project deliverable.
- Perform Calculation for MRPRuns a company-wide material requirements planning calculation.
- Perform Calculation for Project MRPRuns a project-level material requirements planning calculation.
- Create Supply Request for Purchase Order PlanGenerates a supply request that feeds into a planned purchase order.
- Create Supply Request for Shop Order PlanGenerates a supply request that feeds into a planned shop order.
- Issue to Project DeliverablesIssues material from inventory directly to a project deliverable.
- Perform Calculation for MRPRuns a company-wide material requirements planning calculation.
- Perform Calculation for Project MRPRuns a project-level material requirements planning calculation.
- Review Project MRP and MRP ResultsLets planners review the output of project and company MRP runs side by side.
- Review and Manage Supply RequestLets planners review, adjust, and approve supply requests generated for a project.
Will IFS Applications meet your create material supply for project deliverables needs? Build your requirements and perform a full analysis.
Build my requirements →Contract Change Management5
Contract Change Management governs how variations to a contract or project's scope, timeline, or commercial terms are reviewed, approved, and tracked once the original agreement is in place.
- Analyze Contract Change OrderEvaluates the cost and schedule impact of a proposed contract change order.
- Approve Contract Change OrderAuthorizes a contract change order before it takes effect.
- Finalize Contract Change OrderCompletes a contract change order and applies it to the original contract.
- Plan and Implement Contract Change OrderPlans the execution of an approved contract change order and puts it into effect.
Will IFS Applications meet your contract change management needs? Build your requirements and perform a full analysis.
Build my requirements →Sub Contract Management10
Manages sub contracts with suppliers across their lifecycle, from tender invitations and awards through cost control, revisions, and applications for payment.
- Award Sub ContractAwards a sub contract to the selected supplier.
- Create Contract RequirementsDefines the requirements a sub contract must satisfy.
- Execute Sub ContractRecords execution progress on an awarded sub contract.
- Finalize Sub ContractFinalizes the terms of a sub contract.
- Modify Sub ContractRecords changes to an existing sub contract.
- Award Sub ContractAwards a sub contract to the selected supplier.
- Create Contract RequirementsDefines the requirements a sub contract must satisfy.
- Execute Sub ContractRecords execution progress on an awarded sub contract.
- Finalize Sub ContractFinalizes the terms of a sub contract.
- Modify Sub ContractRecords changes to an existing sub contract.
- Release Sub ContractReleases a sub contract for supplier action.
- Review Sub ContractSupports review of sub contract terms and status.
- Sub Contract Valuation PlanDefines the plan used to value work performed under a sub contract.
- Submit Sub ContractSubmits a sub contract for approval.
Will IFS Applications meet your sub contract management needs? Build your requirements and perform a full analysis.
Build my requirements →Sub Contract Valuation6
Values work performed under sub contracts and processes the resulting certifications, applications for payment, invoices, and payments.
- CertificationCertifies the value of work completed against a sub contract valuation.
- Create ValuationCreates a valuation of work performed under a sub contract.
- PaymentRecords payment made against a certified sub contract valuation.
- Receive Application for PaymentReceives an application for payment submitted by a contractor.
- Receive Invoice on Sub ContractReceives and records an invoice issued against a sub contract.
Will IFS Applications meet your sub contract valuation needs? Build your requirements and perform a full analysis.
Build my requirements →Compatible Unit Execution-As Built6
Tracks execution of compatible unit work in the field, covering activation, work task execution and conclusion, redesign, and decommissioning of a revision.
- Activate Compatible Unit RevisionActivates a compatible unit revision so it can be executed in the field.
- Conclude Work TaskCloses out a work task once the compatible unit work is complete.
- Decommission Compatible Unit RevisionRetires a compatible unit revision that's no longer active.
- Execute Work TaskCarries out the work task associated with a compatible unit revision.
- Redesign Compatible Unit RevisionReworks a compatible unit revision's design based on as-built field conditions.
Will IFS Applications meet your compatible unit execution-as built needs? Build your requirements and perform a full analysis.
Build my requirements →Design Project Deliverables5
Structures a project's deliverable items, from systems and sub-systems down to individual materials, each with its own item number, description, and eventual part number as the design is finalized.
- Create Navigation ModelBuilds a navigation model that organizes how project deliverables are structured for browsing.
- Create Project Deliverables Basic StructureSets up the basic structure of items making up a project's deliverables.
- Create Project Deliverables DefinitionDefines the requirements and details behind each project deliverable item.
- Create Project Deliverables Detailed StructureBuilds out the detailed structure of a project deliverable once requirements are set.
Will IFS Applications meet your design project deliverables needs? Build your requirements and perform a full analysis.
Build my requirements →Sales Application for Payment9
Manages the process of applying for payment from customers for completed work, covering preparation, certification, invoicing, and matching of payments received.
- Allocate Payment on ApplicationAllocates a received payment against a specific application for payment.
- Cancel Payments on ApplicationCancels a payment previously recorded against an application for payment.
- Certify ApplicationCertifies the values submitted on an application for payment.
- Create Project InvoiceCreates a project invoice based on a certified application for payment.
- Match Payment with InvoiceMatches a received payment to its corresponding invoice.
- Allocate Payment on ApplicationAllocates a received payment against a specific application for payment.
- Cancel Payments on ApplicationCancels a payment previously recorded against an application for payment.
- Certify ApplicationCertifies the values submitted on an application for payment.
- Create Project InvoiceCreates a project invoice based on a certified application for payment.
- Match Payment with InvoiceMatches a received payment to its corresponding invoice.
- Prepare ApplicationPrepares an application for payment ahead of submission.
- Receive Payment on ApplicationRecords a payment received against an application for payment.
- Submit ApplicationSubmits a prepared application for payment for approval.
Will IFS Applications meet your sales application for payment needs? Build your requirements and perform a full analysis.
Build my requirements →Invoicing and Closure5
Covers preparing, previewing, and finalizing sales invoices before they close out and post.
- Create Invoice PreviewGenerates a draft view of a sales invoice before it is finalized.
- Define or Generate Sales InformationDefines or generates the underlying sales data used to build an invoice.
- Handling Invoice PreviewReviews and processes a draft invoice preview prior to closure.
- Modify Invoice Preview InformationEdits details on a draft invoice preview before it is finalized.
Will IFS Applications meet your invoicing and closure needs? Build your requirements and perform a full analysis.
Build my requirements →Sales Contract Management10
Manages sales contracts through their full lifecycle, from responding to tenders and estimating costs through negotiation, revision, and completion, with financial control throughout.
- Bid ContractPrepares a bid in response to a customer tender.
- Complete ContractMarks a sales contract as complete once work is finished.
- Create Contract EnquiryRecords an initial enquiry that may lead to a sales contract.
- Estimate ContractEstimates the cost and value of a proposed sales contract.
- Finalize ContractFinalizes the agreed terms of a sales contract.
- Bid ContractPrepares a bid in response to a customer tender.
- Complete ContractMarks a sales contract as complete once work is finished.
- Create Contract EnquiryRecords an initial enquiry that may lead to a sales contract.
- Estimate ContractEstimates the cost and value of a proposed sales contract.
- Finalize ContractFinalizes the agreed terms of a sales contract.
- Modify ContractRecords a modification to an existing sales contract.
- Negotiate ContractTracks negotiation activity on a sales contract.
- Review ContractSupports review of sales contract terms and status.
- Submit TenderSubmits a tender response to a customer.
Will IFS Applications meet your sales contract management needs? Build your requirements and perform a full analysis.
Build my requirements →Install and Commission Project Deliverables5
Covers installing and commissioning the deliverables produced by a project, including turning work packages into work orders and copying the deliverables structure into asset design records.
- Copy Deliverables Structure to Asset DesignCopies a project's deliverables structure into the corresponding asset design record.
- Create Work Order from Work PackageGenerates a work order directly from a defined work package.
- Create Work PackageDefines a work package that groups the installation and commissioning tasks for a deliverable.
- Review and Manage Work OrderLets managers review and adjust work orders created for installation and commissioning.
Will IFS Applications meet your install and commission project deliverables needs? Build your requirements and perform a full analysis.
Build my requirements →Estimate Bid Management9
Manages the estimating and bidding process using separate revision and version handling, so the scope of work and its pricing can each change independently across multiple offers to a customer.
- Calculate EstimateCalculates the cost and price outcome of an estimate.
- Create Business ObjectCreates the business object an estimate is built around.
- Create Estimate VersionCreates a new pricing version of an estimate.
- Enter Estimate Request - GenericEnters a generic estimate request that isn't tied to a specific product.
- Enter Estimate Request - ProductEnters an estimate request for a specific product.
- Calculate EstimateCalculates the cost and price outcome of an estimate.
- Create Business ObjectCreates the business object an estimate is built around.
- Create Estimate VersionCreates a new pricing version of an estimate.
- Enter Estimate Request - GenericEnters a generic estimate request that isn't tied to a specific product.
- Enter Estimate Request - ProductEnters an estimate request for a specific product.
- Handle Deliverables for CustomerManages the deliverables promised to a customer as part of an estimate.
- Maintain Estimate RequestMaintains an estimate request as details change.
- Transfer ProductTransfers a product's data into an estimate.
Will IFS Applications meet your estimate bid management needs? Build your requirements and perform a full analysis.
Build my requirements →Project Accounting6
Tracks financial activity on projects originating from project or customer order modules, supporting revenue recognition forecasting, periodic capitalization, and project completion.
- Complete Financial ProjectMarks a project as financially complete once all transactions are closed.
- Create Revenue Recognition ForecastBuilds a forecast of revenue to be recognized on a project over time.
- Handle Periodical Capitalization and Revenue RecognitionProcesses periodic capitalization and revenue recognition entries for a project.
- Handle Project Completion DetailsRecords the financial details needed to close out a completed project.
- Query Revenue RecognitionReviews recognized and forecasted revenue amounts for a project.
Will IFS Applications meet your project accounting needs? Build your requirements and perform a full analysis.
Build my requirements →Maintenance and Cleanup of Data4
Covers keeping operational data accurate and manageable over time, including archiving historical logs, correcting erroneous entries, and updating vehicle condition history.
- Archive Historical Operational LoggingsArchives older operational log entries to keep active records manageable.
- Correct Operational LoggingsLets staff correct errors found in previously recorded operational log entries.
- Update Vehicle Condition HistoryUpdates the recorded condition history of a vehicle.
Will IFS Applications meet your maintenance and cleanup of data needs? Build your requirements and perform a full analysis.
Build my requirements →Plan Project Deliverables8
Plan Project Deliverables covers estimating and planning the deliverables of a project, including material, shipment, and work task plans, operational guidelines, and reserving the material and serialized items needed to fulfil them.
- Create Material PlanCreates a material plan for a project deliverable.
- Create Operations and GuidelinesDefines the operations and guidelines needed to produce a project deliverable.
- Create Shipment PlanCreates a shipment plan for delivering project materials or output.
- Create Work Task PlanCreates a work task plan for a project deliverable.
- Estimate Project DeliverablesEstimates the cost and effort of project deliverables.
- Create Material PlanCreates a material plan for a project deliverable.
- Create Operations and GuidelinesDefines the operations and guidelines needed to produce a project deliverable.
- Create Shipment PlanCreates a shipment plan for delivering project materials or output.
- Create Work Task PlanCreates a work task plan for a project deliverable.
- Estimate Project DeliverablesEstimates the cost and effort of project deliverables.
- Manage Material ReservationManages material reservations tied to project deliverables.
- Manage Serial ReservationManages reservations of serialized items tied to project deliverables.
Will IFS Applications meet your plan project deliverables needs? Build your requirements and perform a full analysis.
Build my requirements →Project Conclusion4
Covers the final phase of a project, where deliverables are handed over to the customer, the project plan is completed, and the project is formally closed once all objectives are confirmed met.
- Close ProjectFormally closes a project once all remaining activities and administrative tasks are complete.
- Complete ProjectMarks a project's plan as complete once the majority of planned activities have finished.
- Hand Over Project DeliverablesHands the project's completed deliverables over to the customer.
Will IFS Applications meet your project conclusion needs? Build your requirements and perform a full analysis.
Build my requirements →Project Execution15
Covers day-to-day execution of project work, including recording time against activities, developing and approving forecasts and accruals, and analyzing overall project performance.
- Analyze Project PerformanceAnalyzes a project's progress, cost, and revenue against its plan.
- Approve Project AccrualApproves an accrual raised against project costs.
- Approve Project ForecastApproves a forecast submitted for a project.
- Connect Objects Manually to ActivityLets users manually link related objects to a project activity.
- Create Project AccrualCreates an accrual to reflect costs incurred but not yet invoiced on a project.
- Analyze Project PerformanceAnalyzes a project's progress, cost, and revenue against its plan.
- Approve Project AccrualApproves an accrual raised against project costs.
- Approve Project ForecastApproves a forecast submitted for a project.
- Connect Objects Manually to ActivityLets users manually link related objects to a project activity.
- Create Project AccrualCreates an accrual to reflect costs incurred but not yet invoiced on a project.
- Create and Develop Project ForecastLets project managers build and refine a forecast for cost, hours, and revenue.
- Enter Work RecordingRecords work performed against a project activity.
- Execute ActivityMarks a project activity as started and in progress.
- Execute Project Miscellaneous DemandFulfills a miscellaneous material or resource demand raised by a project.
- Release ActivityReleases a project activity so work on it can begin.
- Submit Project AccrualSubmits a created project accrual for approval.
- Supporting Process: Project ForecastingSupports the broader project forecasting process with related tools and checks.
- Transfer Project Accrual TransactionsTransfers accrual transactions between projects or accounting periods.
- Update Project Forecast ProgressUpdates a project forecast to reflect current progress.
Will IFS Applications meet your project execution needs? Build your requirements and perform a full analysis.
Build my requirements →Manage Rent to Project3
Manages project-based rentals initiated from project demand, covering rental transfers and finalizing project rental charging.
- Finalize Rental, Project ChargingFinalizes the charges billed to a project for a rented asset.
- Manage Rental TransfersTransfers a rented asset between projects or locations.
Will IFS Applications meet your manage rent to project needs? Build your requirements and perform a full analysis.
Build my requirements →Project Reporting17
Covers financial reporting and transaction handling for projects, including invoicing, cost accounting, work-in-progress tracking, and posting logic for project-related transactions.
- Approve TransactionApproves a project transaction before it posts to the general ledger.
- Change Project TransactionsLets users edit details of a project transaction before it is finalized.
- Credit Project InvoiceIssues a credit against a previously raised project invoice.
- Forward Employee ExpenseForwards an employee expense transaction into project reporting.
- Forward Material WithdrawalForwards a material withdrawal transaction into project reporting.
- Approve TransactionApproves a project transaction before it posts to the general ledger.
- Change Project TransactionsLets users edit details of a project transaction before it is finalized.
- Credit Project InvoiceIssues a credit against a previously raised project invoice.
- Forward Employee ExpenseForwards an employee expense transaction into project reporting.
- Forward Material WithdrawalForwards a material withdrawal transaction into project reporting.
- Forward Supplier InvoiceForwards a supplier invoice transaction into project reporting.
- Hours per Activity and EmployeeReports hours worked broken down by project activity and employee.
- List Project Reporting Unconfirmed DaysLists days with unconfirmed time reporting across a project.
- Project Correction InvoiceIssues a correction invoice to fix an error on a previous project invoice.
- Project InvoicingGenerates customer invoices based on reported project costs and progress.
- Project Reporting AnalysisProvides analysis tools for reviewing project reporting data.
- Project Reporting Cost AccountingHandles the cost accounting entries generated by project reporting.
- Project Work in ProgressTracks the value of work in progress accumulated on a project.
- Receive Incoming Multi-Company TransactionsReceives project transactions sent in from another company in a multi-company structure.
- Report Project Time and CostCaptures time and cost incurred against a project activity.
- Transfer Multi-Company Project TransactionsTransfers project transactions between companies in a multi-company structure.
Will IFS Applications meet your project reporting needs? Build your requirements and perform a full analysis.
Build my requirements →Project Reporting for Contractors5
Lets project managers request and track work performed by temporary contractors hired through employment agencies, from connecting them to a purchase order to approving the time they report.
- Connect Contractors to Purchase OrderLinks a contractor to the purchase order used to request their work.
- Create Invoicing AdviceCreates invoicing advice covering work performed by a contractor.
- Create Purchase Order Line for ContractorsCreates a purchase order line to request work from a contractor.
- Report Project TimeLets a contractor report time worked against project activities.
Will IFS Applications meet your project reporting for contractors needs? Build your requirements and perform a full analysis.
Build my requirements →Project Emissions Calculation3
Project Emissions Calculation tracks a project's CO2 or CO2-equivalent footprint by combining emissions data from project parts with manually entered figures at the demand, activity, sub-project, or project level. Totals are visible at every level, from a single activity up to the whole project.
- Enter Manual EmissionsLets users manually enter CO2 emissions data at various project levels.
- Get Emissions for Miscellaneous DemandsRetrieves emissions data tied to miscellaneous demand lines on a project.
Will IFS Applications meet your project emissions calculation needs? Build your requirements and perform a full analysis.
Build my requirements →Project Planning23
Project Planning covers the full life cycle of setting up a project, from initiation, budgeting, and approval through defining deliverables and schedules of work, tendering, forecasting and assigning resources, and keeping demand, estimates, contracts, and forecasts current as the project progresses.
- Approve BudgetRoutes a project budget for approval before it is committed.
- Approve ProjectRoutes a project for formal approval before work begins.
- Create Project Cash ForecastCreates a cash flow forecast for a project.
- Create Schedule of Work EstimateCreates an estimated schedule of work for a project.
- Create Schedule of Work ProductionCreates a production-ready schedule of work for a project.
- Approve BudgetRoutes a project budget for approval before it is committed.
- Approve ProjectRoutes a project for formal approval before work begins.
- Create Project Cash ForecastCreates a cash flow forecast for a project.
- Create Schedule of Work EstimateCreates an estimated schedule of work for a project.
- Create Schedule of Work ProductionCreates a production-ready schedule of work for a project.
- Create and Develop Project BudgetCreates and develops the budget for a project.
- Define Project DeliverablesDefines the deliverables a project is expected to produce.
- Define Project Plan DetailsDefines the detailed plan for how a project will be executed.
- Enable and Create Budget Control RulesSets up budget control rules that govern spending on a project.
- Establish Project PlanEstablishes the overall plan for a project.
- Execute Tender ProcessRuns the tender process for sourcing project work or supplies.
- Forecast and Assign ResourcesForecasts and assigns the resources a project will need.
- Handle Schedule of Work Change OrderManages change orders raised against a project's schedule of work.
- Initiate ProjectInitiates a new project in the system.
- Plan and Assign ResourcesPlans and assigns resources to project tasks.
- Schedule Project and Integrate Project DataSchedules a project and integrates its data with related systems.
- Update Project DemandUpdates the demand recorded against a project.
- Update Project EstimatesUpdates cost and effort estimates for a project.
- Update Project ForecastUpdates the forecast associated with a project.
- Update Project ResourcesUpdates the resources assigned to a project.
- Update Sales ContractUpdates the sales contract linked to a project.
- Update Sub ContractUpdates a subcontract linked to a project.
Will IFS Applications meet your project planning needs? Build your requirements and perform a full analysis.
Build my requirements →Ship Project Deliverables3
Covers shipping a project's deliverables to their destination, including creating and managing the shipment.
- Create ShipmentCreates a shipment to send a project deliverable to its destination.
- Review and Manage ShipmentLets staff review and manage a shipment created for project deliverables.
Will IFS Applications meet your ship project deliverables needs? Build your requirements and perform a full analysis.
Build my requirements →Resource Planning and Monitoring6
Resource Planning and Monitoring covers allocating miscellaneous resources, managing resource relocation, building resource schedules and shifts, entering forecast scenarios, and monitoring resource requirements against availability.
- Create and Manage Misc. Resource AllocationsCreates and manages miscellaneous, non-standard resource allocations.
- Create and Manage Resource RelocationManages the relocation of resources between sites or work locations.
- Create and Manage Resource Schedules and ShiftsBuilds and manages resource schedules and shift patterns.
- Enter Forecast ScenarioEnters a forecast scenario used for resource capacity planning.
- Monitor and Manage Resource RequirementsMonitors resource requirements and manages them against available capacity.
Will IFS Applications meet your resource planning and monitoring needs? Build your requirements and perform a full analysis.
Build my requirements →Service Project Resource Capacity Planning and Scheduling3
Service Project Resource Capacity Planning and Scheduling coordinates resource capacity across grouped service work, such as installations, refurbishments, or recurring service packages, without invoking full project management overhead. It covers planning and scheduling capacity across the service project's quotations and requests, distinguishing requested dates from internally planned delivery dates, including Gantt-based scheduling.
- Resource Capacity Planning and SchedulingPlans and schedules resource capacity across a service project's quotations and requests.
- Scheduling with Service Project Scheduling, GanttSchedules service project work visually using a Gantt-based scheduling view.
Will IFS Applications meet your service project resource capacity planning and scheduling needs? Build your requirements and perform a full analysis.
Build my requirements →Other capabilities15
- Create Contractor OrderCreates a contractor order that links subcontracted work to an agreement, scope, and payment terms.
- Invoice ContractsProduces an invoice for a contract based on its agreed billing schedule.
- Invoice Service ProjectGenerates an invoice for costs and work recorded against a service project.
- Prepare Service ProjectSets up a service project to coordinate grouped service scopes and tasks.
- Apply Complex Assembly Service ContractApplies the pricing terms of a complex assembly service contract to a repair order.
- Create Contractor OrderCreates a contractor order that links subcontracted work to an agreement, scope, and payment terms.
- Invoice ContractsProduces an invoice for a contract based on its agreed billing schedule.
- Invoice Service ProjectGenerates an invoice for costs and work recorded against a service project.
- Prepare Service ProjectSets up a service project to coordinate grouped service scopes and tasks.
- Apply Complex Assembly Service ContractApplies the pricing terms of a complex assembly service contract to a repair order.
- Operational Plan and Structure ConnectionConnects an operational plan to the order or project structure it applies to.
- Manage Punch ListsTracks and manages the items on a punch list through to closure.
Will IFS Applications meet your other capabilities needs? Build your requirements and perform a full analysis.
Build my requirements →The IFS Applications Evaluation Kit
An independent assessment of IFS Applications — strengths, gaps and real pricing — plus a requirements template you can score its project management against alongside every other system on your shortlist.
IFS Applications Evaluation Kit
2026 Edition · PDF guide + XLSX template
ERP Research
- Buyer's guide (PDF): IFS Applications independently assessed — where it is strong, where it is not, and what it actually costs
- Requirements template (XLSX): weight your requirements and score vendors side by side
- Built to work with the 22 project management capabilities scored on this page
- The questions to put to the vendor and to implementation partners
IFS Applications Evaluation Kit
IFS Applications add-ons & integrations
Extend IFS Applications with best-of-breed software that integrates with it:
Highlighted product links go straight to the vendor and are affiliate links — we may earn a commission if you sign up. This never affects which products we list or how we rank them.
Project Management coverage across the systems most often shortlisted alongside it, scored against the same capability list.
| Area | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
|---|---|---|---|---|---|---|---|---|
| Execution & Tracking | 5+1/7 | 1/7 | 7/7 | 2+2/7 | 2+3/7 | 4+3/7 | 2/7 | 3+3/7 |
| Reporting & Billing | 4+2/8 | 1+3/8 | 5+2/8 | 0+3/8 | 4+2/8 | 2+3/8 | 2+3/8 | 3+1/8 |
| Planning | 4/7 | 1+2/7 | 5+1/7 | 4+1/7 | 5+2/7 | 4/7 | 1+2/7 | 3+1/7 |
Each cell reads confirmed+partial/scored. Grey reflects capabilities our research has not confirmed either way — it is not a finding that a product lacks them.
Project Management — strength by vendor
| Vendor | Strength | Best for | Starting price | Implementation | Actions |
|---|---|---|---|---|---|
![]() | ★★★ strong | Midsize companies or subsidiaries needing cloud-first SAP | $120/user/mo | 4–8 months | |
![]() | ★★★ strong | Large enterprises moving from on-premise Oracle to cloud | Custom | 9–18 months | |
![]() | ★★★ strong | Mid-to-large companies in the Microsoft ecosystem | $50/user/mo | 6–14 months | |
![]() | ★★★ strong | Midsize companies wanting unlimited users and flexible cloud ERP | Custom | 4–8 months | |
![]() | ★★★ strong | Service companies and nonprofits needing deep financial management | Custom | 3–6 months | |
![]() | ★★★ strong | Asset-intensive industries needing ERP, EAM, and field service in one platform | $100/user/mo | 6–14 months | |
![]() | ★★★ strong | People-centric organisations needing unified HR + finance | Custom | 6–12 months | |
![]() | ★★★ strong | Professional services firms already on Salesforce | $100/user/mo | 3–7 months |
Evaluating project management on IFS Applications
What to put in front of the vendor before you commit.
- 1Project accounting depth (WIP, revenue recognition)
- 2Resource planning and skill-based allocation
- 3Time and expense capture (mobile, web)
- 4Integration with financial management
- 5Support for your billing models (T&M, fixed price, milestone)
IFS Applications starts at $100/user/mo with a typical total cost of $200K–$1M+ and a 6–14 months implementation.
Full IFS Applications pricing breakdown →Need help evaluating IFS Applications project management?
Tell us what you need it to do and we'll help you work out whether IFS Applications is the right fit — and which partners have done it before.
IFS Applications Project Management FAQ
Is IFS project management built for engineer-to-order and construction-style projects?
Yes — project planning, deliverable design, and punch list management reflect construction and engineering-to-order workflows specifically, not just generic task tracking. Project management is rated strong, aligning with IFS's core industries of construction, aerospace & defense, and complex manufacturing.
Can subcontractor costs be tracked within a project's budget?
Yes — sub contract management and sub contract valuation track subcontracted work as part of overall project cost, so a project manager sees subcontractor spend alongside internal labor and materials rather than as a separate line outside the project system.
Does project billing support progress-based or milestone invoicing?
Yes — project accounting and invoicing and closure support milestone- and progress-based billing common in construction and engineering contracts, rather than only flat-fee or time-and-materials invoicing.
Is project reporting real-time, or only available at close?
Project reporting runs continuously against execution data, including project reporting tailored specifically for contractors managing subcontracted scope — giving visibility into progress and cost as the work happens rather than waiting for period-end.
Other IFS Applications modules
Explore IFS Applications by industry & company size
Related Resources
IFS Applications ERP — Modules & Review
Explore IFS Applications ERP modules, pricing, and capabilities.
ModulesIFS Applications Finance & Accounting
IFS Applications Finance & Accounting capabilities and review.
ModulesIFS Applications Manufacturing
IFS Applications Manufacturing capabilities and review.
ModulesIFS Applications Supply Chain
IFS Applications Supply Chain capabilities and review.
ModulesIFS Applications Sales
IFS Applications Sales capabilities and review.